- Tuzigoot, 1940
- Tuzigoot and Cottonwood, 1940
- Tuzigoot, 1945
- Group IV, Room 2
- Tuzigoot Extension Excavation
- Cleaning up Unit IV
- Cleaning Up Unit IV
- Recapping the Wall
- Cement Stabilization Cap
- Memorial Day, 1966
- The 1968 Stabilization Crew
- Before and After Capping
- Stabilization, 1965
- Group IV, Room 2
- Installing Benches